« January 2007 | Main | March 2007 »

February 27, 2007

Fourth Floor Update, February 27, 2007

Temporary construction walls are going up around the fourth floor. The stacks will remain open, including call numbers N-Z, Juvenile and Young Adult Literature.

A view facing Special Collections and Archives, with the temporary constructions walls on the left.
spec-coll_022607_01.small.jpg

The temporary walls align the walkway facing the elevators.
spec-coll_022607_04.small.jpg

Near the study tables, workers build the temporary walls.
spec-coll_022607_06.small.jpg

February 26, 2007

Special Collections Materials Available in Media and Reserve Services

Cabell's Special Collections and Archives department will be closed February 26 through May 21 for renovations to the fourth floor. During this time, patrons needing materials from these collections may request them at the Media and Reserves Services desk on the third floor of Cabell from 10:00 a.m. to 2:00 p.m., Monday through Friday. Professors who wish to make use of materials for their classes, patrons who wish to do research in manuscripts and archives, and patrons who require access outside of those hours should contact the Special Collections and Archives staff at 804-828-1108 to make special arrangements.

We apologize for any inconvenience and appreciate your patience as we renovate these important public spaces.

Fourth Floor Renovations Begin - February 26

The fourth floor renovations began February 26th and are slated for completion in August. The fourth floor stacks are open. Patrons needing Special Collections Materials should go to the Media and Reserve Services desk between 10:00 a.m. and 2:00 p.m., Monday through Friday.

A view of the near empty Special Collections and Archives.

spec-coll_022307_01.small.jpg


February 20, 2007

Starbucks Update, February 20, 2007

Starbucks is nearly ready for the March 5th opening.

starbucks_021907_01_small.jpg

starbucks_021907_04_small.jpg

February 13, 2007

Starbucks Update, February 13, 2007

Every day, the completed Starbucks vision becomes clearer.

starbucks_021307_01.small.jpg

starbucks_021307_05.small.jpg

February 12, 2007

Renovation Schedules and Update for 4th Floor

The renovation of Cabell Library's fourth floor will begin on February 28 with completion scheduled for July.


spec-coll_021207_06.small.jpg

The "old" doors to Special Collections and Archives will soon close so a new and improved area can be constructed.


spec-coll_021207_04.small.jpg

Much of the area to the left in this photograph will be the new John Mapp Graduate Study and Reading Room.

February 9, 2007

Fourth Floor Floor Plan

Do you want to see what the new fourth floor will look like? Click the link below for a full-page pdf image of the floor plan which includes a new entrance hall with built-in display cabinets, the much needed John Mapp Graduate Study & Reading Room, a renovated Cabell Room including improved lighting, and a renovated Special Collections and Archives, including improvements to the outer lobby area, reading area and office space.

Download file

Special Thanks
Please join us in thanking supporters of the VCU Libraries for the generous financial gifts that have made the Fourth Floor renovations possible. To learn more about how you can support the VCU Libraries, please contact 804-827-1163 or 804-828-1165.

February 8, 2007

New Furniture on the First Floor of Cabell

New furniture will be purchased for the first floor of Cabell Library thanks to special funding from the Provost's Office. Over fifty seats will be added to the library's active entry floor, while worn and outdated furnishings that remain are updated. Items to be purchased include: study and cafe-style tables and seating; upholstered loveseats and lounge chairs, some with tablet arm work surfaces; coffee tables; rolling task chairs for use at computer carrels; rocking chairs; adjustable height tables for use with the Libraries' assistive technology; and equipment furniture for the Print/Photocopy area.

Goals of the project are to:
- add badly needed seats in a high-use area of the building
- replace outdated and worn furniture
- ensure more efficient use of seats by offering more individual and cafe-table style seating
- allow for more flexible furniture placement near outlets and network drops for laptop users
- make use of nooks and crannies on the floor that permit an individual "comfy" chair
- maximize window areas with seating that provides reflective space for study or contemplation

Furniture will be received and installed by the end of the fiscal year and will provide new options for library users beginning summer of 2007.

Images of some furniture that will be replaced in Cabell Library:

oldfurniture6.small.jpg

oldfurniture3.small.jpg

Starbucks Update, February 8, 2007

starbucks_020707_06small.jpg

starbucks_020707_16small.jpg

starbucks_020707_09small.jpg

The sales area takes shape.

February 2, 2007

Starbucks Update, February 2, 2007

020207.10small.jpg

020207.11small.jpg

Each day Starbucks becomes closer to completion.