Fourth Floor Update, February 27, 2007

Temporary construction walls are going up around the fourth floor. The stacks will remain open, including call numbers N-Z, Juvenile and Young Adult Literature.

A view facing Special Collections and Archives, with the temporary constructions walls on the left.
spec-coll_022607_01.small.jpg

The temporary walls align the walkway facing the elevators.
spec-coll_022607_04.small.jpg

Near the study tables, workers build the temporary walls.
spec-coll_022607_06.small.jpg