Fourth Floor Update, February 27, 2007
Temporary construction walls are going up around the fourth floor. The stacks will remain open, including call numbers N-Z, Juvenile and Young Adult Literature.
A view facing Special Collections and Archives, with the temporary constructions walls on the left.

The temporary walls align the walkway facing the elevators.

Near the study tables, workers build the temporary walls.
