<?xml version="1.0" encoding="utf-8"?>
<rss version="2.0">
   <channel>
      <title>Under Construction: VCU Libraries Renovations</title>
      <link>http://www.library.vcu.edu/blog/renovations/</link>
      <description></description>
      <language>en</language>
      <copyright>Copyright 2008</copyright>
      <lastBuildDate>Fri, 20 Jul 2007 09:06:28 -0500</lastBuildDate>
      <generator>http://www.sixapart.com/movabletype/?v=3.34</generator>
      <docs>http://blogs.law.harvard.edu/tech/rss</docs> 

            <item>
         <title>Fourth Floor Update, July 20, 2007</title>
         <description><![CDATA[<p>Work on the John Mapp Graduate Study and Reading Room continues, as Special Collections and Archives staff work to settle into their newly revitalized space. Special Collections is open 8 a.m to 5 p.m, Monday through Friday.</p>

<p><img alt="071707_0021smaller.jpg" src="http://www.library.vcu.edu/blog/renovations/071707_0021smaller.jpg" width="225" height="150" /><br />
</p>]]></description>
         <link>http://www.library.vcu.edu/blog/renovations/2007/07/fourth_floor_update_july_20_20.html</link>
         <guid>http://www.library.vcu.edu/blog/renovations/2007/07/fourth_floor_update_july_20_20.html</guid>
         <category>Fourth Floor</category>
         <pubDate>Fri, 20 Jul 2007 09:06:28 -0500</pubDate>
      </item>
            <item>
         <title>Stairwell Demolition - Update</title>
         <description><![CDATA[<p>Demolition of the central stairwell started last Friday and is nearly complete. Additional information regarding this demolition is available <a href="http://www.library.vcu.edu/blog/renovations/2007/06/cabell_library_stairwell_demol.html">on this post</a>.</p>

<p>Below is an image of the central stairwell demolition. The construction wall at the top and slightly left of this image is facing the Floyd Avenue stacks.</p>

<p><img alt="stairwelldemo_062507_0004.jpg" src="http://www.library.vcu.edu/blog/renovations/stairwelldemo_062507_0004.jpg" width="225" height="150" /><br />
</p>]]></description>
         <link>http://www.library.vcu.edu/blog/renovations/2007/06/stairwell_demolition_update.html</link>
         <guid>http://www.library.vcu.edu/blog/renovations/2007/06/stairwell_demolition_update.html</guid>
         <category>Fourth Floor</category>
         <pubDate>Fri, 22 Jun 2007 15:59:52 -0500</pubDate>
      </item>
            <item>
         <title>Cabell Library - Stairwell Demolition Update</title>
         <description><![CDATA[<p>Renovations continue with the upcoming demolition of the central stairwell between the third and the fourth floor. <strong>Demolition is slated for Friday, June 22, Saturday, June 23 and Monday, June 25</strong>. Friday's work will be the extremely disruptive throughout the building, particularly near the central core. Cabell Library patrons can expect somewhat less disruptive noise throughout the rest of the demolition period, except to those patrons in the central area of the building on the 2nd, 3rd and 4th floors. Study space on the first floor, away from the central area of the building, should be the least noisy area. Earplugs will be available at the Circulation and Information Services desk on the first floor and the Media and Reserve Services desk on the third floor.</p>

<p>We thank you for your patience during these important renovations.</p>

<p><img alt="4thcenterstairs.4.020207.small.jpg" src="http://www.library.vcu.edu/blog/renovations/4thcenterstairs.4.020207.small.jpg" width="225" height="150" /></p>]]></description>
         <link>http://www.library.vcu.edu/blog/renovations/2007/06/cabell_library_stairwell_demol.html</link>
         <guid>http://www.library.vcu.edu/blog/renovations/2007/06/cabell_library_stairwell_demol.html</guid>
         <category>Fourth Floor</category>
         <pubDate>Mon, 18 Jun 2007 08:10:35 -0500</pubDate>
      </item>
            <item>
         <title>Fourth Floor Update, June 13, 2007</title>
         <description><![CDATA[<p>With the installation of new display cabinets, the fourth floor entrance hall is nearly complete. Construction walls have been placed for work on Phase II.</p>

<p><img alt="4th_floor_cabs_02.061307.jpg" src="http://www.library.vcu.edu/blog/renovations/4th_floor_cabs_02.061307.jpg" width="225" height="169" /></p>

<p><img alt="4th_floor_cabs_03.061307.jpg" src="http://www.library.vcu.edu/blog/renovations/4th_floor_cabs_03.061307.jpg" width="225" height="169" /><br />
</p>]]></description>
         <link>http://www.library.vcu.edu/blog/renovations/2007/06/fourth_floor_update_june_13_20.html</link>
         <guid>http://www.library.vcu.edu/blog/renovations/2007/06/fourth_floor_update_june_13_20.html</guid>
         <category>Fourth Floor</category>
         <pubDate>Wed, 13 Jun 2007 16:13:45 -0500</pubDate>
      </item>
            <item>
         <title>Fourth Floor Update,  June 8, 2007</title>
         <description><![CDATA[<p>The redesigned fourth floor entrance hall has opened, marking the final steps to the first phase of renovations. New exhibit cases will be installed early next week. New furniture will follow in late summer.</p>

<p>Early next week Phase II construction will begin with the closure of the area that will become the John Mapp Graduate Study and Reading Room. This area is directly between the new entrance hall wall and the Special Collections/Cabell Room walls, heading back towards the stacks. The stairwell between the third and fourth floor will also be closed as demolition of that stairwell will begin mid-month. </p>

<p>Special Collections and Archives will remain open with <a href="http://www.library.vcu.edu/whatsnew/news_result.cfm?ID=1059">limited hours and service</a> through the Media and Reserves Services Desk for the next few weeks.</p>

<p>An image of the fourth floor entrance hall, two days before completion:<br />
<img alt="fourthfloor_60607_005.jpg" src="http://www.library.vcu.edu/blog/renovations/fourthfloor_60607_005.jpg" width="225" height="150" /></p>]]></description>
         <link>http://www.library.vcu.edu/blog/renovations/2007/06/fourth_floor_update_june_8_200.html</link>
         <guid>http://www.library.vcu.edu/blog/renovations/2007/06/fourth_floor_update_june_8_200.html</guid>
         <category>Fourth Floor</category>
         <pubDate>Fri, 08 Jun 2007 08:52:44 -0500</pubDate>
      </item>
            <item>
         <title>Cabell Library Furniture Upgrades Nearly Complete</title>
         <description><![CDATA[<p>All the new furnishings for James Branch Cabell Library's first, second and third floors have arrived, with special thanks to the Provost's office. In the coming weeks, library staff will continue to arrange the new furniture.</p>

<p>Here are some images of the process; more photographs are available via the link at the bottom of this entry.</p>

<p><strong>Out with the old:</strong><br />
<img alt="oldfurn051707_213.jpg" src="http://www.library.vcu.edu/blog/renovations/oldfurn051707_213.jpg" width="225" height="150" /></p>

<p><img alt="oldfurn052907_220.jpg" src="http://www.library.vcu.edu/blog/renovations/oldfurn052907_220.jpg" width="225" height="138" /></p>

<p><strong>In with the new: </strong><br />
<img alt="newfurn052507_09.jpg" src="http://www.library.vcu.edu/blog/renovations/newfurn052507_09.jpg" width="225" height="150" /></p>

<p><img alt="newfurn052507_15.jpg" src="http://www.library.vcu.edu/blog/renovations/newfurn052507_15.jpg" width="225" height="150" /></p>]]></description>
         <link>http://www.library.vcu.edu/blog/renovations/2007/05/cabell_library_furniture_upgra_1.html</link>
         <guid>http://www.library.vcu.edu/blog/renovations/2007/05/cabell_library_furniture_upgra_1.html</guid>
         <category>New Cabell Furnishings</category>
         <pubDate>Thu, 31 May 2007 09:23:15 -0500</pubDate>
      </item>
            <item>
         <title>Fourth Floor Update,  May 18, 2007</title>
         <description><![CDATA[<p>The main hallway on the fourth floor, in the final stages of construction. The top photograph is facing into the fourth floor from the elevators, the bottom is from the opposite end facing the elevators. While the new furniture will take a little longer, this area should be reopened by the beginning of June.</p>

<p><img alt="fourthfloor_051807_21.jpg" src="http://www.library.vcu.edu/blog/renovations/fourthfloor_051807_21.jpg" width="225" height="150" /></p>

<p><img alt="fourthfloor_051807_26.jpg" src="http://www.library.vcu.edu/blog/renovations/fourthfloor_051807_26.jpg" width="225" height="150" /></p>]]></description>
         <link>http://www.library.vcu.edu/blog/renovations/2007/05/fourth_floor_update_may_18_200.html</link>
         <guid>http://www.library.vcu.edu/blog/renovations/2007/05/fourth_floor_update_may_18_200.html</guid>
         <category>Fourth Floor</category>
         <pubDate>Fri, 18 May 2007 17:00:00 -0500</pubDate>
      </item>
            <item>
         <title>First Floor Cabell Library Furniture Has Arrived</title>
         <description><![CDATA[<p>New furniture for Cabell Library's first floor arrived on May 15 and was assembled and installed the following day. The additions include an array of options for library patrons seeking study havens:  tables and chairs for groups of twos, threes or fours; sofas and love seats; soft chairs with tablet arms for laptop use or writing; computer task chairs and group study room furnishings.  </p>

<p>The third floor and most of the second floor have been cleared for the deliveries to those locations, which begin Wednesday, May 23rd. If you usually study in these areas you will find plenty of seating on the first floor, in the second floor group study zone and on the fourth floor. We appreciate your patience while we get our new furnishings in place.</p>

<p><img alt="newfurnituresmall19.jpg" src="http://www.library.vcu.edu/blog/renovations/newfurnituresmall19.jpg" width="225" height="150" /></p>

<p><img alt="newfurnituresmall21.jpg" src="http://www.library.vcu.edu/blog/renovations/newfurnituresmall21.jpg" width="225" height="150" /><br />
</p>]]></description>
         <link>http://www.library.vcu.edu/blog/renovations/2007/05/first_floor_cabell_library_fur.html</link>
         <guid>http://www.library.vcu.edu/blog/renovations/2007/05/first_floor_cabell_library_fur.html</guid>
         <category>New Cabell Furnishings</category>
         <pubDate>Fri, 18 May 2007 16:17:54 -0500</pubDate>
      </item>
            <item>
         <title>Cabell Library Fourth Floor Access, May 14-18, 2007</title>
         <description><![CDATA[<p>In order to conduct renovations outside the fourth floor elevators during the week between Spring and Summer semesters, Cabell Library will be closing off the area directly outside the two main elevators from May 14-18. The fourth floor stacks and study areas will still be accessible via the freight elevator, around the corner from the main elevators, and all stairwells except the one behind the elevators, stairwell #4. Floor maps of Cabell Library are available <a href="http://www.library.vcu.edu/jbc/maps/">online</a>.</p>

<p>The Center for Teaching Excellence (CTE) will be reachable via the stairwell behind the elevators, stairwell #4. Visitors to CTE who require elevator access should call 828-1108 or come to the Media & Reserves Services desk on the third floor of Cabell Library to be escorted from the freight elevator to CTE's offices.</p>

<p>Signs will be posted to help visitors navigate their way to and on the floor. We apologize for any inconvenience. </p>

<p>For additional renovation updates, visit the <a href="http://www.library.vcu.edu/blog/renovations/">Renovations Blog</a>.</p>]]></description>
         <link>http://www.library.vcu.edu/blog/renovations/2007/05/cabell_library_fourth_floor_ac.html</link>
         <guid>http://www.library.vcu.edu/blog/renovations/2007/05/cabell_library_fourth_floor_ac.html</guid>
         <category>Fourth Floor</category>
         <pubDate>Thu, 10 May 2007 12:30:54 -0500</pubDate>
      </item>
            <item>
         <title>Furniture Arrival: Updates and Alerts</title>
         <description><![CDATA[<p>From May 11 to 25, <a href="http://www.library.vcu.edu/blog/renovations/new_cabell_furnishings/">new furniture will be arriving and installed in Cabell Library</a>. Though some computer and other equipment will be temporarily inaccessible as the installation takes place, at no time will Cabell Library lose all printing services or access to microforms readers or public workstations. Signs will be posted throughout the building alerting library patrons about the status of the project.</p>

<p><strong>Known impacts to services include:</strong></p>

<p>--Assistive Technology Room and Accessible Public Workstations:<br />
The Assistive Technology Room and the two accessible public workstations on the first floor will be unavailable from Monday, May 14 to Wednesday, May 16.  If possible, service will be restored on Tuesday, May 15.</p>

<p>--Public Printing Stations:<br />
1st floor: from Monday, May 14 to Wednesday, May 16 <br />
If possible, service will be restored on Tuesday, May 15.</p>

<p>2nd and 3rd floors: from Wednesday, May 23 to Thursday, May 24.  <br />
If possible, service will be restored on Wednesday, May 23.</p>

<p>Printing services will be available on either the first or the second and third floors during the entire installation process. At no time will printing services be completely unavailable. Library patrons may also print in the basement lab.</p>

<p>--i-Mac workstations:<br />
1st floor: from Monday, May 14 to Thursay, May 24</p>

<p>--Public workstations:<br />
2nd floor: Friday, May 18 - Thursday, May 24<br />
3rd floor: Thursday, May 17 - Thursday, May 24<br />
If possible, service will be restored on Wednesday, May 23.  </p>

<p>--Microfilm/fiche readers:<br />
3 of the 4 workstations will need to be stored temporarily; the 4th machine will be located in the Media and Reserves room nearby on the third floor.  </p>]]></description>
         <link>http://www.library.vcu.edu/blog/renovations/2007/05/furniture_arrival_updates_and.html</link>
         <guid>http://www.library.vcu.edu/blog/renovations/2007/05/furniture_arrival_updates_and.html</guid>
         <category>New Cabell Furnishings</category>
         <pubDate>Tue, 08 May 2007 16:54:34 -0500</pubDate>
      </item>
            <item>
         <title>Fourth Floor Update,  May 1, 2007</title>
         <description><![CDATA[<p>Construction completion on the first phase of the fourth floor is slated for mid-June.</p>

<p>A view into the Special Collections and Archives Reading Room.<br />
<img alt="spec-coll_043007_1.small.jpg" src="http://www.library.vcu.edu/blog/renovations/spec-coll_043007_1.small.jpg" width="225" height="150" /></p>

<p>A view from inside the Reading Room towards the main entrance to Special Collections and Archives.<br />
<img alt="spec-coll_043007_5.small.jpg" src="http://www.library.vcu.edu/blog/renovations/spec-coll_043007_5.small.jpg" width="225" height="150" /></p>

<p>The staff work area is also near completion. Note the back wall is temporary, and will be open to the Special Collections and Archives stacks after construction.<br />
<img alt="spec-coll_043007_2.small.jpg" src="http://www.library.vcu.edu/blog/renovations/spec-coll_043007_2.small.jpg" width="225" height="150" /></p>]]></description>
         <link>http://www.library.vcu.edu/blog/renovations/2007/05/fourth_floor_update_april_30_2.html</link>
         <guid>http://www.library.vcu.edu/blog/renovations/2007/05/fourth_floor_update_april_30_2.html</guid>
         <category>Fourth Floor</category>
         <pubDate>Tue, 01 May 2007 08:23:09 -0500</pubDate>
      </item>
            <item>
         <title>Furniture Delivery Update, April 30, 2007</title>
         <description><![CDATA[<p><strong>Delivery schedules </strong>have been finalized for the new Cabell Library study furniture. At the end of spring semester final exams, furniture will begin to be replaced.</p>

<p>-<strong>May 11-14:</strong> Older furniture begins to be relocated or sent to surplus. Selected public computers will be temporarily stored until installation is completed.</p>

<p>-<strong>May 15-18: </strong>Delivery and set-up of first floor furniture.</p>

<p>-<strong>May 21-25:</strong> Delivery and set-up of second and third floor furniture. </p>

<p>Please bear with us as the furniture delivery takes place. Because it is such a large amount of furniture, the <strong>elevators will be heavily used</strong> both in moving the old furniture out and the new furniture in. <strong>Public computers and other equipment</strong> will need to be temporarily moved out of harms way, but will be put back in place as soon as it is safe to do so. Library staff will be working with Disability Services to alert them to brief periods when our public accessible computers and <strong>assistive technology rooms will be impacted</strong>. Appropriate signage will be posted within the library alerting patrons to the various delivery activities. </p>

<p>By June, Cabell Library will be a much improved place to study with a new and spruced up look, ready for summer term researchers and students. Combined with the completion of the fourth floor renovation in July, the upgraded library environment will help welcome new and returning students this fall.<br />
</p>]]></description>
         <link>http://www.library.vcu.edu/blog/renovations/2007/04/furniture_delivery_may_1_updat.html</link>
         <guid>http://www.library.vcu.edu/blog/renovations/2007/04/furniture_delivery_may_1_updat.html</guid>
         <category>New Cabell Furnishings</category>
         <pubDate>Mon, 30 Apr 2007 14:50:20 -0500</pubDate>
      </item>
            <item>
         <title>Renovation Progress and Fourth Floor Study</title>
         <description><![CDATA[<p>The fourth floor construction process is on schedule. Components taking place in the next few weeks include installing new partition walls, painting, flooring installation and fine tuning and inspection of Phase I before Phase II begins in mid May. </p>

<p>The timing of the construction has coincided with spring semester which impacts students studying in the library, which is regrettable. Despite hopes for the renovation to take place between semesters, unavoidable delays and news that the project would take significantly longer than anticipated to complete determined that there was no scheduling which would permit better timing. VCU Libraries staff has worked closely with the construction team to avoid noisy tasks at peak hours. Construction takes place during the workday only, permitting quiet study evenings and weekends. In addition, the noisiest components of the project are scheduled for after exams. A new quiet study area on the second floor has been established. The new area is identified by signs and is at the front of the building on the second floor overlooking the bus stop, facing the Cathedral. </p>

<p>At project completion: for the first time, graduate students will have a dedicated reading room, as is common at many universities. Cabell Library's excellent Special Collections and Archives department will have a badly needed rejuvenation and added space to house its important collections. Added exhibit space and an improved overall fourth floor appearance will mean a truly fine facility for the VCU community. VCU Libraries is extremely sensitive to the issues the construction causes for students, however, and appreciate understanding as these improvements move forward.<br />
</p>]]></description>
         <link>http://www.library.vcu.edu/blog/renovations/2007/04/renovation_progress_and_fourth.html</link>
         <guid>http://www.library.vcu.edu/blog/renovations/2007/04/renovation_progress_and_fourth.html</guid>
         <category>Fourth Floor</category>
         <pubDate>Mon, 16 Apr 2007 09:39:28 -0500</pubDate>
      </item>
            <item>
         <title>Fourth Floor Update,  April 6, 2007</title>
         <description><![CDATA[<p>The offices in Special Collections and Archives take shape.</p>

<p><img alt="spec-coll_041207_2.small.jpg" src="http://www.library.vcu.edu/blog/renovations/spec-coll_041207_2.small.jpg" width="225" height="150" /></p>

<p><img alt="spec-coll_041207_5.small.jpg" src="http://www.library.vcu.edu/blog/renovations/spec-coll_041207_5.small.jpg" width="225" height="150" /><br />
</p>]]></description>
         <link>http://www.library.vcu.edu/blog/renovations/2007/04/fourth_floor_update_april_6_20.html</link>
         <guid>http://www.library.vcu.edu/blog/renovations/2007/04/fourth_floor_update_april_6_20.html</guid>
         <category>Fourth Floor</category>
         <pubDate>Fri, 06 Apr 2007 09:16:18 -0500</pubDate>
      </item>
            <item>
         <title>Fourth Floor Update,  March 22, 2007</title>
         <description><![CDATA[<p>A view of Special Collections and Archives.</p>

<p><img alt="spec-coll_031507_01.small.jpg" src="http://www.library.vcu.edu/blog/renovations/spec-coll_031507_01.small.jpg" width="225" height="150" /></p>

<p>The main hallway, this view is facing away from the elevators.<br />
<img alt="spec-coll_031507_09.small.jpg" src="http://www.library.vcu.edu/blog/renovations/spec-coll_031507_09.small.jpg" width="225" height="150" /></p>]]></description>
         <link>http://www.library.vcu.edu/blog/renovations/2007/03/fourth_floor_update_march_22_2.html</link>
         <guid>http://www.library.vcu.edu/blog/renovations/2007/03/fourth_floor_update_march_22_2.html</guid>
         <category>Fourth Floor</category>
         <pubDate>Thu, 22 Mar 2007 11:52:13 -0500</pubDate>
      </item>
      
   </channel>
</rss>
